Page Numbers: Yes X: 530 Y: 10.5" First Page: 5 Columns: 1 Edge Margin: .6" Between Columns: .4" Margins: Top: 1.3" Bottom: 1" Line Numbers: No Modulus: 5 Page-relative Even Heading:qk40(635) MAXC Room Power Down Procedurey756qck40\30f1 Odd Heading:qk40 Power Upy756qck40\8f1 4. Start Up Sequence:x6e12jk40\f5b21B Close only those circuit breakers on panels marked Maxc, Maxc-A, & Maxc-B, that were opened during the initial powerdown sequence. x6e12jk40\7ui4UI Twinkle (Should be started first for Date & Time source to other systems.) x6e12jk40\1b7B1bi66BI Turn on AC Power and spin up disks Boot ALTO Type GATEWAY (2 minutes to come on) l5468x6e12jk40 NOTE 5: Don't bring anything else up until message "Gateway in operation" appears on Twinkle screen, or 1 minute after screen turns blank, whichever occurs first. l5468x6e12jk40(0,6350)(1,8128)\1bi4B1b2BI1f1 156f0 Remaining machines can be started in any order (or simultaneously). x6e12jk40(635)\1bi67BI DLSx6e12jk40\1b3B Set CKT breaker Spin up disk Boot ALTO Type DLSCONTROL l5468x6e12jk40 Juniperx6e12jk40\1b7B Turn on ALTOs Spin up Diablo disks Turn on Trident disk AC power Spin up Trident Disks Boot Type @RunServer l5468x6e12jk40 Maxc1 (Ref. Sections 3 & 5, Maxc Operations) x6e12jk40\1b5B2i22b15B1I Turn on NOVA power (key switch) Spin up disk and push red protection light Set front panel NOVA switches to 100040 Toggle RESET Toggle PROGRAM LOAD Turn on all Processor and Memory cabinet power supplies On the Nova terminal (Infoton), issue the command: POWER ON Turn on Disk drive AC power (in rear) then front panel switches. l5468x6e12jk40 WARNING: Wait at least 10 seconds between spinning up each drive to allow for the starting surge. l5468x6e12jk40(0,6350)\1bi8BI Normally the configuration is set up properly; just type MIDAS TENGO. See Section 5 & 6 of Maxc Operations for abnormal situations. l5468x6e12jk40(635)\92bi15BI Maxc2x6e12jk40\1b5B Turn on ALTO Spin up ALTO disk Turn on all Processor and Memory cabinet power supplies Boot the Alto and run the Midas subsystem. With the left mouse button, succesively select the menu items "Power On", "Both", and "Do-It". Turn on Disk drive AC power (in rear) then front panel switches l5468x6e12jk40 WARNING: Wait at least 10 seconds between spinning up each drive to allow for the starting surge. l5468x6e12jk40(0,6350)\bi9BI Normally the configuration is set up properly; just type MIDAS TENGO. See Section 5 & 6 of Maxc Operations for abnormal situations. l5468x6e12jk40(635)\92bi15BI After all disk drives are ready you may start AltIO and start Tenex by selecting "Run-Prog", "Tengo" with the mouse. l5468x6e12jk40(0,6350) Ivyx6e12jk40(635)\1b3B Turn on ALTO Spin up Diablo disk Turn on Trident disks AC power Spin up Trident Disks Boot Type IFS/F NOTE 6: The /F is temporary - see Ivy operation instructions (next to terminal) for current procedure. l5468x6e12jk40\115bi7BI1f1 104f0 Doradosx6e12jk40\1b7B Turn on Breakers (that's all) l5468x6e12jk40 Impx6e12jk40\1b Should restart by itself. Call NCC to verify correct operation. l5468x6e12jk40 Referencesx6e36k120\b 1. Edward R. Fiala, Charles M. Geschke, and Edward Taft, Maxc Operations, XEROX, January 30, l981. l3696d2992x3e6jk40(0,3712)(1,65535)\57bi15BI