Page Numbers: Yes X: 527 Y: 10.5" First Page: 107 Columns: 1 Edge Margin: .4" Between Columns: .4" Margins: Top: 1.3" Bottom: .75" Line Numbers: No Modulus: 5 Page-relative Even Heading:qk40(635) Appendix Maxc Operationsy756qk40(0,4233)(1,13053)\f5b1f0i8f5I23f1B Odd Heading: qk40(635) Maxc Operations Appendixy756qk40(0,15875)(1,65535)\f5b16f0i8f1BI MAXC Room Power Down/Up Procedurey648x6(635)\f9b by Ron Weaverz18697e24(0,5152)\f6b OCTOBER 1980 (Revised April 24, 1984) Filed on [Indigo]MaxcOpsPowerDownUp.Bravoz18697e24\f7b13Bi24I48b Abstract: This procedure itemizes the chronological steps necessary to systematically shut down the power in the Maxc room when a known power outage is scheduled. z18697x6e54j\f6b10B152f0 1f6 EMERGENCY shutdown procedure (for fire or smoke) may be found in Appendix A. z18697x6e12j(635)\f6b10B66f0 1f6 A version of this procedure will appear in the Maxc Operations manual. z18697x6e12j\f6 47i16I7f0 1f6 XEROXz18697l10230y144\f2 5f7b PALO ALTO RESEARCH CENTER 3333 Coyote Hill Road / Palo Alto / California 94304l10239(2116)\f6b26f7 1. Prior to Shutdowny720x6e36k792(635)\f5b In order to give users adequate notice and to protect files on disk, Tenex should ordinarily be stopped in the following manner. d3705x6e10jk40 Forty-eight hours prior to the scheduled power outage send a message to the NCC Coordinator and the Arpanet liaison at SCI via their Arpanet mailboxes CONTROL@BBNC and Green@SCI-ICS stating the period the power will be off and that the IMP will be affected. If the scheduled power outage is to take place in less than 48 hours then the NCC Coordinator may be reached direct by phone: (617) 661-0100. The controller may wish you to call him just prior to taking the system down so you can set some switches on the IMP panel. As long as possible before the scheduled downtime (preferably 24 hours or more), notify users by (optionally) putting a notice in the login message, setting the system downtime cell and recording a telephone message. x6e10jk40 A. To put a notice in the login message, login as yourself and: x6e10jk40 @SNDMSG To: SYSTEM cc: Subject: Scheduled downtime Message: (An appropriate message giving date, time, and reason) ^Z Q,S,?,carriage-return: SYSTEM -- ok @l5468x6e10jk40\1u10U5u10U4u4U10u22U67u2U23u4U B. To set the system downtime cell, you must be a wheel or a maintenance person: x6e10jk40 @ENABLE (only if you are a wheel) !HALT, (do not omit the comma) [Superpassword:]GUESS !!AT mm/dd/yy/ hh:mm (date & time system going down) !!UNTIL mm/dd/yy hh:mm (date & time coming back up) !!DUE (TO REASON) reason (type ? for list) !! !l5468x6e10jk40\1u10U3i4I14i5I4u9U6i3I34u9U3u22U39u24U36u22U18u4U4u4U C. To record a telephone message, go to the recording telephone (next to the Imp in the back room) and follow the instructions posted there. x6e10jk40 2. System Shutdown x6e12jk40\f5b19f0B General Methodology: (1) Shut down software systems cleanly (2) Safeguard rotary storage by spinning down all disk drives (3) Get all other power off in the simplest manner possible so that restart can be accomplished without an excessive current surge. x6e12jk40\1i20I1i41I1i64I1i140I Maxc x6e12jk40\b5B The system will automatically start notifying users of the impending downtime beginning one hour before it is to occur. When the zero hour arrives, all jobs will be forcibly logged out except any job logged in on the Maxc controlling terminal, new logins will be prevented, and "Shutdown Complete" will type out on the Maxc console. If there are now no jobs logged in, Tenex will shortly hit a BUGCHK (EDDT breakpoint) at SWHLT1, at which point Tenex is properly halted. l5468x6e6jk40 If there is a job logged in on the Maxc controlling terminal, it will be necesary to halt Tenex manually. To do this (for which you must be a wheel): l5468x6e6jk40\143i5I @ENABLE !QUIT .Halt Tenex. l6703x6e12jk40\1u10U2u8U2u1U9u1U Wait for the EDDT preakpoint at SWHLT1. A message such as "$8B>>CHKADR BUGCHK/ SWHLT1" should be printed out. l5468x6e6jk40 Once the Maxc2 system have halted you may proceed by stopping the rest of the systems in the Maxc room. l5468x6e6jk40 Alpine Boot Dorado. (Really!) x6e12jk40\b7B17i9I Ivy From an Alto or DLS terminal: x6e12jk40\1b3B Chat Ivy Ena NOTE 1: You must be an Ivy wheel. Halt Quitl5468x6e6jk40\24bi7BI20i5I Twinklex6e12jk40\1b7B Ctrl-Shift-D (to turn on display) Position cursor over "gateway" window, press down middle button, select "gateway" menu, let up button. Press down middle button, select "quit" item, let up button. l5468x6e6jk40 DLSx6e12jk40\1b3B Quitl5468x6e6jk40 3. Removing System Power x6e12jk40\f5b25f0B Maxc Disk Drives x6e12jk40\1b16B Turn off Front switch first, then the switch in the rear. l5468x6e12jk40 NOTE 2: An alternate procedure, (which is not advised due to the fact that some circuit breakers may be in the off state prior to shutdown for some reason, and the difficulty in correctly identifying all of them may lead to errors when restoring power) instead of turning off the switch in the rear of each disk drive, is to wait until everything else in this section has been done and then throw all the circuit breakers on the Maxc, Maxc-A and Maxc-B Circuit Breaker Panels, noting carefully the ones which are already off. l6703x3e12jk40\bi8f1BI34ui3UI456i16I1i30I1f0 Maxcx6e12jk40\1b4B Press middle blank button then type 3301P M. With the left mouse button successively select the menu items "Power Off" and "Both".l5468x6e12jk40 NOTE 4: (The message "Processor locked on" will appear. Just shut off the processor power supply manually. The automatic power-off circuitry is missing.) l5468x6e12jk40\3bi7BI1f1 131f0 8f1 23f0 Spin down ALTO disk Throw CKT breaker on front of Processor Throw CKT breakers on all power supplies (front). Pull 20 amp CKT breaker on panel above ALTO. l5468x6e12jk40 Twinkle x6e12jk40\1b7B Spin down disks (wait until they stop) Pull out upper blower drawer and turn off switch inside top left. l5468x6e12jk40\16i22I Alpinex6e12jk40\1b6B Spin down disks (Dorado T-80 and T-300 #1). Power down Dorado as for any Dorado. Turn off T-80 and T-300 disk power switches. l5468x6e12jk40 Ivyx6e12jk40\1b3B Spin down disks (ALTO & six Trident disks) Turn off ALTO power switch Turn off T-80 & T-300 disk power switches (in rear, or see NOTE 2 on page 3) l5468x6e12jk40\131bi6BI DLSx6e12jk40\1b3B Spin down disk and (after it stops) pull 15 amp CKT breaker above. l5468x6e12jk40\19i17I IMPx6e12jk40\1b3B Don't worry about it unless NCC has asked you from an earlier phone call to call just before removing power. NCC likes to be called two days before scheduled shutdowns. l5468x6e12jk40 Doradosx6e12jk40\1b7B For each Dorado, if it is not already powered off (green light 5 flash) find its terminal and press boot button seven times in quick succession to shut down. Wait until green lights are flashing fives before throwing CKT breakers. l5468x6e12jk40\50i21I 4. Start Up Sequence:x6e12jk40\f5b21B Close only those circuit breakers on panels marked Maxc, Maxc-A, & Maxc-B, that were opened during the initial powerdown sequence. x6e12jk40\7ui4UI Twinkle (Should be started first for Date & Time source to other systems.) x6e12jk40\1b7B1bi66BI Turn on AC Power and spin up disks Boot ALTO Type GATEWAY (2 minutes to come on) l5468x6e12jk40 NOTE 5: Don't bring anything else up until message "Gateway in operation" appears on Twinkle screen, or 1 minute after screen turns blank, whichever occurs first. l5468x6e12jk40(0,6350)(1,8128)\1bi4B1b2BI1f1 156f0 Remaining machines can be started in any order (or simultaneously). x6e12jk40(635)\1bi67BI DLSx6e12jk40\1b3B Set CKT breaker Spin up disk Boot ALTO Type DLSCONTROL l5468x6e12jk40 Maxcx6e12jk40\1b4B Turn on ALTO Spin up ALTO disk Turn on all Processor and Memory cabinet power supplies Boot the Alto and run the Midas subsystem. With the left mouse button, succesively select the menu items "Power On", "Both", and "Do-It". Turn on Disk drive AC power (in rear) then front panel switches l5468x6e12jk40 WARNING: Wait at least 10 seconds between spinning up each drive to allow for the starting surge. l5468x6e12jk40(0,6350)\bi9BI Normally the configuration is set up properly; just type MIDAS TENGO. See Section 5 & 6 of Maxc Operations for abnormal situations. l5468x6e12jk40(635)\92bi15BI After all disk drives are ready you may start AltIO and start Tenex by selecting "Run-Prog", "Tengo" with the mouse. l5468x6e12jk40(0,6350) Alpinex6e12jk40(635)\1b6B Turn on Dorado. Turn on T-80 and T-300 power. Spin up T-80 and T-300. Boot. Type cr to command line "Luther". l5468x6e12j Ivy x6e12jk40\1b3B Turn on ALTO Spin up Diablo disk Turn on Trident disks AC power Spin up Trident Disks Boot Type IFS l5468x6e12j Doradosx6e12jk40\1b7B Turn on Breakers (that's all) l5468x6e12jk40 Impx6e12jk40\1b Should restart by itself. Call NCC to verify correct operation. l5468x6e12jk40 Referencesx6e36k120\b 1. Edward R. Fiala, Charles M. Geschke, Edward Taft, and Ronald L. Weaver Maxc Operations, XEROX, April 24, 1984. l3696d2992x3e6jk40(0,3712)(1,65535)\74bi15BI (635)